Process Automation

New Building Test Center Mechanics and Electrics
New Building Test Center Mechanics and Electrics

Order placed by: Maschinenfabrik Reinhausen

Location: Reinhausen

 

Description:

Two priorities of information have been set up for the control engineering of the oil management. The priority of information 1 includes all oil supply pumps and the tank plant, the priority of information 2 includes the control engineering of the oil management concerning the test vessels, test racks, test cells etc.

The decentralized valve terminals for the compressed air shut-off valves and the decentralized input/output modules are connected to the Siemens PLCs via Profibus-DP.

 

The entire installation is connected to the new management level in the building via Ethernet TCP/IP.

 

ISP01: Oil Management

Supply and disposal of the electric and mechanical test center for step switches with oils for transformers.

-          460 hardware data points

-          1,100 software data points

 

ISP02: Control engineering of the oil management concerning the test vessels, test racks and test cells etc.

-          6 controls

-          8,200 software data points

-          3,600 hardware data points